Solar Panel Installation Procedure: What to Expect Usually, home solar panel installation follows this basic procedure: Site Assessment and Design. Timeframe: 1 - 4 weeks. This phase starts with an initial site survey, in which your solar energy generating system will be evaluated to determine your exact energy requirements. This then determines the size and type of the system you will need. This includes details on the number of solar panels you will need, the number of batteries you will need to store the energy produced, and your overall electricity consumption. These factors will determine the size and complexity of the entire solar power setup. You will also be told the location of the solar energy generating system, what time period it is likely to take to fully activate (or completely cut your electricity bill), and any weather restrictions you may need to adhere to during the activation process.
Once you have chosen a site for your solar panel installation, the next step is to create a design for the new solar energy generating system. This usually requires a visit to the hardware store. This is where you will choose the new solar energy system components, as well as decide on how much of each item you will need. This link will guide you on getting the right solar energy generating systems for your home.


The solar panel installation process typically proceeds in two ways. First, the site survey is completed. If the preliminary site survey results in good news, you will next be directed to the fabrication shop. Here you can decide exactly how many components you want to buy, and what quantity of each item will comprise. You will also be given instructions and be expected to follow them closely. Finally, your new solar energy generating system will be manufactured to your specific specifications.
Roofing Installation: As the second step of the solar panel installation process, you will be happy to know that installing solar panels on roofs is not only easy, but cost-effective! However, before you begin the installation process, you must check with your local roofer to determine if your roof can support the weight of one or more solar panels. Depending upon your roof's overall weight capacity, the best way to go about this is to contact your local roofer and ask if they can do the installation for an additional fee. This option can save you valuable time, money, and energy in the long run.
The third step of the solar panel installation process is to gather the materials you will need. This might include plywood, a sheet of glass, copper wire, nails, screws, and brackets. You will also need to locate your access point for the connection between the panels and the battery bank. This access point should be somewhere near your attic. Once you have these items gathered, it is time to begin the actual installation process!


The fourth step of the home solar installation process is to connect all of the solar panels together using the screws and brackets. At this time, you can also install any other items you wish to support the battery bank. Once this is completed, you can begin to test the connection and adjust accordingly. Finally, attach the wires and the battery to the roof. At this point, the solar panel installation day is complete! Get a general overview of the topic here: https://en.wikipedia.org/wiki/Solar_panel.

I BUILT MY SITE FOR FREE USING